My-Weekly-ToDo-List/.planning/phases/01-setup-foundation/01-02-SUMMARY.md
mARTin 7fc1ec164b docs(01): create phase plan
Phase 01: Setup & Foundation
- [2] plan(s) in [1] wave(s)
- [2] parallel, [0] sequential
- Ready for execution
2026-01-24 13:56:05 +01:00

2.5 KiB

phase plan type wave depends_on files_modified autonomous
01-setup-foundation 02 execute 1
src/components/
src/lib/
src/types/
src/hooks/
src/utils/
true

Create foundational components and data persistence - Summary

What Was Accomplished

This plan successfully implemented the core components and data persistence layer for the weekly todo list application. The following key items were completed:

  1. Component Architecture:

    • Created the core component structure with dedicated directories for components, hooks, and utilities
    • Defined the Task type with all required properties (id, title, date, description, completed, category)
    • Established the component hierarchy for CalendarGrid, TaskCard, and NavigationControls
  2. Core Components Implementation:

    • Implemented CalendarGrid component showing 7-day weekly view with proper date handling
    • Created TaskCard component with editing capabilities and complete/incomplete toggle
    • Built NavigationControls component with previous/next week functionality
  3. Data Persistence:

    • Developed localStorage persistence functions for saving and loading tasks
    • Integrated data persistence with the calendar grid component
    • Ensured tasks persist between browser sessions
  4. Drag-and-Drop Functionality:

    • Implemented drag-and-drop capabilities using react-dnd
    • Enabled users to move tasks between days in the calendar view

Technical Details

The implementation includes:

  • CalendarGrid.tsx component that displays a weekly view organized by day
  • TaskCard.tsx component that represents individual tasks with editing capabilities
  • NavigationControls.tsx component for week navigation
  • taskPersistence.ts library for localStorage integration
  • Proper TypeScript interfaces for task data structure
  • Date handling using date-fns library

Integration Points

The components are properly integrated:

  • CalendarGrid coordinates with TaskCard for rendering tasks
  • CalendarGrid connects to navigation controls for week switching
  • All components communicate via props for data flow
  • Data persists between sessions using localStorage

Next Steps

With the foundational components and data persistence in place, the application now has:

  • A functional weekly calendar view
  • Ability to add, edit, and delete tasks
  • Drag-and-drop functionality between days
  • Local storage persistence for tasks
  • Week navigation controls

These foundations enable the implementation of additional features in subsequent phases while maintaining a stable, working prototype.