Phase 01: Setup & Authentication - [3] plan(s) in [2] wave(s) - [2] parallel, [1] sequential - Ready for execution
4.0 KiB
4.0 KiB
My Weekly To Do List - Roadmap
Overview
This roadmap delivers the My Weekly To Do List application in four phases, starting with core functionality and building toward a complete, polished experience. Each phase delivers a coherent set of capabilities that users can verify and use incrementally.
Phases
Phase 1: Setup & Authentication
Goal: Users can securely access the application and manage their account
Plans: 3 plans
Plans:
- 01-01-PLAN.md — Set up the foundational authentication system for the weekly task management application including signup, login, and logout functionality with secure session management.
- 01-02-PLAN.md — Implement complete authentication flow including email verification, password reset, and middleware protection for authenticated routes.
- 01-03-PLAN.md — Implement complete email verification and password reset functionality to complete the authentication system.
Requirements:
- AUTH-01: User can sign up with email and password
- AUTH-02: User receives email verification after signup
- AUTH-03: User can reset password via email link
- AUTH-04: User session persists across browser refresh
- UI-01: Clean, minimal interface similar to TeuxDeux
- UI-02: Responsive design that works on desktop and tablet
- UI-03: Intuitive controls for task management
Success Criteria:
- User can create an account with email/password
- User receives and can verify email address after signup
- User can reset password via email link
- User stays logged in across browser sessions
- Application interface loads and displays correctly on desktop and tablet devices
- User can navigate core UI elements intuitively
Phase 2: Task Management and Weekly View
Goal: Users can create, manage, and visualize their tasks in a weekly calendar view
Requirements:
- TASK-01: User can create tasks with title and description
- TASK-02: User can edit existing tasks
- TASK-03: User can delete tasks
- TASK-04: User can mark tasks as complete/incomplete
- TASK-05: User can view tasks in a weekly grid view
- WEEK-01: User can navigate between weeks
- WEEK-02: User can view tasks and calendar events in a unified weekly view
- WEEK-03: User can drag and drop tasks between days of the week
- WEEK-04: User can see time allocation clearly with visual indicators
Success Criteria:
- User can create new tasks with title and description
- User can edit existing tasks with updated information
- User can delete tasks from their list
- User can mark tasks as complete or incomplete
- User can view tasks organized in a weekly grid layout
- User can navigate between different weeks in the calendar
- User can drag tasks between different days of the week
- User can clearly see how time is allocated across days with visual cues
Phase 3: Calendar Integration
Goal: Users can connect external calendar accounts and synchronize data
Requirements:
- CAL-01: User can connect their Google Calendar account
- CAL-02: User can connect their Apple Calendar account
- CAL-03: User can view calendar events alongside tasks in weekly view
- CAL-04: User can synchronize tasks and calendar events bidirectionally
Success Criteria:
- User can connect their Google Calendar account through OAuth
- User can connect their Apple Calendar account through OAuth
- User can see calendar events displayed alongside tasks in the weekly view
- User's tasks and calendar events are synchronized bidirectionally between the app and connected calendars
- User can manage calendar connection settings from the application
Phase 4: Final Polish
Goal: Enhanced user experience and refined functionality
Requirements:
- (No specific requirements for this phase, though all previous requirements are completed)
Success Criteria:
- All application features function consistently and reliably
- User interface is polished and responsive across all device sizes
- Application performs well under typical usage scenarios
- All user flows are intuitive and well-tested
- Accessibility standards are met for core functionality